Kingdta — PCB & PCBA Manufacturer
EMS Services

PCB Rework & Repair Service

Component replacement, BGA reballing, solder joint repair, and design modification rework. Recover failed assemblies and implement ECO changes without scrapping boards.

PCB rework and repair services save time and money by recovering assemblies that would otherwise be scrapped. Kingdta's rework team handles everything from simple component replacements to complex BGA reballing and engineering change order (ECO) modifications. All rework is performed by IPC-certified technicians using hot-air rework stations, BGA rework systems, and microscope-assisted soldering. Post-rework X-ray and AOI inspection confirms the quality of every reworked joint.

PCB rework and repair with BGA reballing and hot-air rework station

IPC-Certified Technicians

All rework performed by IPC-7711/7721 certified technicians using professional rework equipment.

BGA Reballing & Replacement

Full BGA rework capability: removal, reballing with new solder balls, and replacement of BGA devices.

Post-Rework X-Ray Verification

X-ray inspection after BGA rework confirms solder ball formation and joint quality.

ECO Modifications

Engineering change order modifications: trace cuts, wire jumpers, component value changes.

Technical Specifications

Rework StandardIPC-7711/7721 (Rework, Modification and Repair)
BGA ReworkRemoval, reballing, replacement — pitches down to 0.3mm
Component TypesBGA, QFN, QFP, SOT, 0201, through-hole, connectors
Rework EquipmentERSA IR550A BGA rework station, hot-air rework, microscope soldering
ECO ServicesTrace cuts, wire jumpers, component adds/removes, marking changes
Post-Rework InspectionX-ray (BGA), AOI, visual inspection under microscope
Minimum Order1 board
Lead Time2–5 days depending on complexity
Conformal Coating RemovalAvailable (chemical or mechanical)

Our Process

1

Failure Analysis & Assessment

We review the board, identify the rework scope, and confirm feasibility. For complex rework, we may request X-ray or AOI images of the failed area.

2

Conformal Coating Removal (if applicable)

If the board has conformal coating, it is carefully removed in the rework area using chemical or mechanical methods.

3

Component Removal

Failed component removed using appropriate method (hot air, IR, BGA rework station) without damaging adjacent components or PCB.

4

Pad Cleaning & Preparation

Pads cleaned, inspected under microscope, and prepared for new component installation. Damaged pads repaired if needed.

5

Component Installation & Reflow

New component placed and reflowed using controlled temperature profile. BGA components reballed if required.

6

Post-Rework Inspection

X-ray inspection for BGA rework; AOI and visual inspection for all other rework. Results documented in rework report.

Industry Applications

Prototype Recovery: Recover expensive prototype boards from assembly defects
ECO Implementation: Engineering change orders on existing inventory without re-manufacturing
Field Return Repair: Repair of returned units from field failures
Component Shortage: Replace obsolete components with approved alternates
Upgrade & Modification: Memory upgrades, firmware chip replacement, connector changes
Quality Escapes: Rework of production batches with identified assembly defects

We've placed 14 orders with Kingdta over 2 years — from 5-board prototypes to 2,000-unit production runs. Consistent quality, transparent pricing, and they always flag potential issues before they become problems.

Head of Hardware Engineering · Autonomous Systems Company · Amsterdam, Netherlands

Trusted by 500+ global hardware teams

Ready to start your project?

Frequently Asked Questions

What Our Clients Say

Recover Boards, Save Projects

“We had 300 boards with a wrong BGA. Kingdta's rework team replaced all of them in 5 days with X-ray verification. Saved us $40K in scrap costs.”
Robert Kim
Manufacturing Engineer · Consumer Electronics Brand · South Korea
“ECO implementation on 500 units in production — trace cuts and wire jumpers done perfectly. Post-rework inspection report included for every board.”
Elena Rossi
Quality Manager · Industrial Controls Co. · Italy
“Field returns with BGA failures. Kingdta reballed and replaced the chips, provided X-ray reports, and turned around 80 units in a week. Outstanding.”
Carlos Mendez
Field Service Director · Telecom Infrastructure Co. · Spain